May 02, 2024
The groundbreaking event of PT Maxindo Karya Anugerah plant 3 in the
Kendal Industrial Park happened on 2 May 2024. Their 1st construction
phase of 1.2 Ha begins in May 2024 and it is estimated to be completed in
December 2024. Thr total investment value is Rp 200 billion with capacity production
around 475 tons per month and labour. Labour absorption is estimated around
400-500 people. Previously, PT Maxindo has 2 existing factories, plant 1 and
plant 2, which both are located in Sentul Industrial Estate.
PT Maxindo Karya Anugerah produces cassava chips as ready-to-eat snacks.
Since 2011, this factory has decided to produce healthy snacks. Over the time,
they begin to develop their products to become more sustainable.
Also present at the groundbreaking event were Sarkoro Handajani as President Director of PT Maxindo Karya Anugerah, Carolina Renata Djaja as Director of PT Maxindo Karya Anugerah, Garett Suryowijoyo Kartono as Director of PT Maxindo Karya Anugerah, and David Surtandi as Director of PT Bhineka Ciptabahana Pura.